Services Service Areas About Reviews 3123133253

Home → Services → Metal Roofing

Metal Roofing in Chicago, IL

Chicago Roofing Team installs metal roofing systems that withstand lake-effect snow, hail, and prairie wind—protecting homes across Wicker Park, Lincoln Park, and surrounding neighborhoods. Our metal panels last 40-50 years with minimal maintenance while keeping gutters flowing and ceilings dry through harsh Chicago winters. Call 312-313-3253 today for a free roof inspection and estimate on residential metal roofing.

Call 3123133253

What Is Metal Roofing?

Metal roofing replaces traditional asphalt shingles with interlocking metal panels—typically standing-seam or exposed-fastener designs—installed over your roof deck. Chicago's harsh climate demands superior materials: our metal roofing systems use 29 gauge standing-seam steel or corrugated aluminum panels, coated with Kynar 500 PVDF or Galvalume Plus for decades of protection. These panels are custom-formed to fit your home's gables, hips, valleys, eaves, and overhangs, with integrated flashing at skylights, chimneys, and other roof penetrations.

Standing seam panels hide fasteners beneath batten strips, eliminating the fastener corrosion that plagues exposed-fastener systems in Chicago's humid, freeze-thaw winters. The result? A roofline that handles 100°F+ temperature swings without stress cracks, ice dam backup, or wind uplift failure.

Materials That Build a Lasting Roof

A complete metal roofing system includes far more than panels. Here's what protects your home:

  • Standing-seam metal panels (typically 29 gauge steel or aluminum) form the weather surface, coated with Kynar 500 PVDF or Galvalume Plus for superior corrosion resistance.
  • Synthetic underlayment or roofing felt provides a secondary water barrier, with ice-and-water shield covering valleys and eaves to stop seepage.
  • Flashing systems seal all penetrations: step flashing at sidewalls, counter-flashing at chimneys, pipe boots around vents, and valley flashing where roof planes intersect.
  • Ridge cap and ridge vent allow attic ventilation while preventing rain and snow intrusion at the ridge beam.
  • Drip edge extends under underlayment at eaves and rakes (gable edges) to prevent water from wicking into soffit and fascia.
  • Ring-shank nails or stainless steel fasteners secure panels without over-driving, hand-sealed with roofing cement or color-matched sealant.
  • Roof deck inspection ensures your substrate (plywood or OSB sheathing, rafters, joists, and trusses) is structurally sound before installation.
  • Gutter and downspout upgrades integrate seamlessly with metal roofing, improving drainage and protecting your foundation.

Why Chicago Homeowners Choose Metal

Lake Michigan creates brutal weather patterns. Winter brings freeze-thaw cycles that crack asphalt shingle seals and allow water to seep into your roof deck and rot your rafters. Spring storms deliver hail and wind that dent and bruise shingles, creating leaks within months.

Metal roofing simply endures:

  • No granule loss or chalking—Kynar coatings resist UV degradation for 30+ years.
  • Standing seams won't split, curl, or delaminate through Chicago's 100°F+ annual temperature swings.
  • Thermal expansion is managed by floating fasteners that move with each panel, preventing stress cracks at seams and edges.
  • Wind uplift ratings exceed 150 mph—exceeding Chicago building code requirements for high-wind zones.
  • Ice dam removal is rarely needed; metal surfaces shed snow faster than asphalt, and proper ventilation through soffit vents and ridge vents minimizes ice backup.

Warning Signs Your Roof Needs Metal Replacement

Check your rooftop for these indicators:

  • Water stains on ceilings or attic insulation, even after prior repairs—a sign of active leaks finding new paths.
  • Visible rust stains running down siding from rusty flashing or fastener corrosion.
  • Loose or missing screws in existing metal panels, or crumbling counter-flashing at chimneys.
  • Dented panels from hail damage, or standing water (ponding) collecting on roof surfaces.
  • Widespread cracking and splits in asphalt shingles, especially in valleys where stress concentrates.
  • Ice dam formation every winter, requiring removal service or heat tape installation.
  • Soft spots or decay in soffit, fascia, or roof deck when probed during inspection.
  • Thermal stress cracks at seams or fastener backup on existing metal panels during high winds.

The Installation Process

Metal roofing installation follows Chicago building code and typically takes 3-7 days depending on roof complexity.

  1. Roof Inspection & Estimate: We inspect your existing roof, measure pitch and square footage, assess structural integrity, and verify building permit requirements. Building code for your Chicago zip code may require engineered drawings for structural changes or wind uplift calculations.
  2. Permit & Material Order: We secure your building permit and order metal panels, underlayment, flashing, ridge vent, ridge cap, and trim to exact specifications. Your roof is scheduled once materials arrive.
  3. Tear-Off or Overlay: We remove old roofing material and haul debris in an on-site dumpster, or perform an overlay if structural load permits. Trusses, joists, and roof deck are inspected for rot, decay, or settling.
  4. Underlayment & Flashing: Synthetic underlayment is laid over the entire roof deck. Flashing is installed at all penetrations: chimneys receive step and counter-flashing; skylights and vents receive boots; valleys receive integrated flashing. Caulk and sealant are applied per specification.
  5. Metal Panel Installation: Starting at the eave, metal panels are secured using fasteners installed per manufacturer specs to prevent fastener backup under high wind. Hand-sealing at fastener heads prevents water intrusion. Ridge vent and ridge cap are installed at the ridge, and soffit vents are verified clear for attic ventilation.
  6. Final Inspection & Cleanup: We walk your roofline with you, verify all flashing, test drainage at valleys and eaves, and ensure ventilation openings function properly. Scaffolding, ladders, and safety equipment are removed, and the property is cleaned.

Cost Ranges for Chicago

Metal roofing for a typical 2,000 sq ft residential home costs $12,000–$25,000, depending on:

  • Roof pitch and complexity (hips, gables, dormers, skylights add cost).
  • Panel type (stone-coated steel or corrugated aluminum; standing seam vs. exposed fastener).
  • Coating grade (Kynar PVDF outlasts Galvalume Plus by 10+ years).
  • Permit and structural engineering (Chicago requires permits; complex decks may need engineer certification).
  • Tear-off versus overlay (full tear-off and debris disposal costs more).

Many insurance policies cover hail damage under replacement clauses. We assist with insurance claims, roof estimates for adjuster review, and proof of loss documentation.

Choosing Your Metal Roofing Contractor

Verify that your contractor is licensed and insured, with experience on Chicago roofs and the panel system you select. Request:

  • Current license number and proof of insurance.
  • References from Chicago homeowners with similar roof pitch and panel type.
  • Written estimate detailing panel type, gauge, coating, labor hours, flashing scope, and warranty terms.
  • A walkthrough inspection with photos documenting current roof condition and roof deck substrate.

Legitimate roofers guarantee workmanship for 10-20 years and provide manufacturer panel warranty (typically 40-50 years). Avoid contractors who promise zero leaks—all roofs may develop isolated leaks in extreme weather if not maintained.

What's Included

  • Complete roof inspection and structural assessment of roof deck, rafters, joists, and trusses
  • Removal and disposal of existing roofing materials in on-site dumpster (full tear-off)
  • Installation of synthetic underlayment or roofing felt with ice-and-water shield at valleys and eaves
  • Custom flashing installation for chimneys, skylights, vents, valleys, eaves, and rakes with step flashing and counter-flashing where needed
  • 29 gauge standing-seam or exposed-fastener metal panels with Kynar 500 PVDF or Galvalume Plus coating
  • Ridge cap, ridge vent, and soffit vent installation for proper attic ventilation and weatherproofing
  • Drip edge, sealant, ring-shank fasteners, and all fastening hardware per Chicago building code specifications
  • 10-year workmanship warranty and manufacturer panel warranty (typically 40-50 years on metal panels)

Our Metal Roofing Process

  1. Roof Inspection & Permit. We inspect your roof, assess Chicago building code requirements for your location, and secure the required building permit for roof replacement before work begins.
  1. Material Selection & Order. Choose your panel type (standing-seam or corrugated), coating finish (Kynar PVDF or Galvalume Plus), and color. We order materials to exact specifications and schedule installation.
  1. Debris Removal & Deck Preparation. We perform a full tear-off of existing roofing, haul all debris in a dumpster, and inspect the roof deck (plywood and OSB sheathing), rafters, and trusses for rot or decay. Any structural damage is repaired before metal installation proceeds.
  1. Underlayment & Flashing Installation. Synthetic underlayment and ice-and-water shield are installed across the entire roof deck. Custom flashing is installed at chimneys, skylights, vents, valleys, and eaves with proper counter-flashing and step flashing details.
  1. Metal Panel Installation. Starting at the eaves, metal panels are secured with fasteners per manufacturer specifications, hand-sealed at fastener heads, and crimped at seams. Ridge cap and ventilation components including soffit vents are installed to ensure proper airflow.
  1. Final Inspection & Cleanup. We inspect all flashing, verify ventilation openings, test drainage at valleys and eaves, remove all equipment and scaffolding, and clean the property.

Signs You Need Metal Roofing

Signs Your Roof Needs Metal Roofing

  • Water stains on ceilings or attic insulation, indicating active leaks penetrating your roof deck
  • Visible rust stains running down siding from corroded flashing or fasteners
  • Loose or missing screws in existing metal panels or counter-flashing crumbling at chimneys
  • Dented panels from hail damage or standing water pooling on roof surfaces causing rot
  • Widespread cracking and curling in asphalt shingles, especially in valleys during freeze-thaw cycles
  • Ice dam formation every winter requiring professional removal service or heat tape installation
  • Soft spots or decay in soffit, fascia, or roof deck when probed during a roof inspection
  • Thermal stress cracks at metal seams or fastener backup on existing panels during prairie storms

Don't just take our word for it — hear from our satisfied customers.

"Chicago Roofing Team replaced our old asphalt roof with standing-seam metal panels in Lincoln Park. The team worked clean, finished on time, and our new roof has already handled two winter storms without a single leak. The communication was excellent throughout. Highly recommend." — David M., Lincoln Park

"We were dealing with ice dam problems every January until we switched to metal roofing on our Wicker Park home. The difference is incredible—no more emergency removal calls or water damage. The installers explained everything clearly, the workmanship was excellent, and the warranty gives us peace of mind." — Sarah L., Wicker Park

"Our Bridgeport house had rust stains on the siding for years from corroded flashing. Chicago Roofing Team did a complete tear-off, installed new metal panels with proper flashing and ventilation, and even upgraded our gutters and downspouts. Best investment we made for our home. Five stars." — Michael R., Bridgeport

Ready to get started? Call us today at 3123133253 for a free estimate.

Free estimates · Licensed & Insured · 25-year warranty

Call 3123133253

Recent Metal Roofing Projects in Chicago

Real work, real roofs — a sample of completed jobs

Completed roofing project
Roof replacement project
New roof installation
Roof repair completed